Chris brings an overall knowledge of the latest and most innovative construction methods to our company and has quickly developed into a valuable member of our project management team. He is a proven project manager who uses a firm approach to problem solving that quickly wins respect from subcontractors and field crews alike. Chris is an approachable member of the team and is always willing to answer any client questions.

 

Years with HCC | 4 Years

 

Other Experience | 13 Years

RELEVANT EXPERIENCE

 

Harrisburg Waste Water Treatment Facility - Harrisburg, SD

TBD  | August 2021

A 1.0 MGD biological treatment facility. The facility will consist of a pretreatment building, a biological treatment facility including final disinfection and aeration, an operations building and an open air biosolids storage facility. This is partnership between HCC and PKG Contracting, Inc. 

 

Augustana University Science Complex - Sioux Falls, SD

$26.0 Million | August 2016

An approximately 46,000 SF addition and the renovation of the existing Gilbert Science Center (80,000 SF) that houses a mix of faculty offices, labs and classrooms.

 

Royal River Casino Phase 4 - Flandreau, SD

$19.15 Million (All four phases) | October 2019

Remodel of the north gaming area, casino cage and restrooms. Site safety and logistics are key in this renovation project. 

 

Royal River Casino Phase 3 - Flandreau, SD

$19.15 Million (All four phases) |
June 2019

Phase three of the renovation of the casino. Work includes updating the east gaming floor, snack bar and center bar while the casino remains open to guests. Site safety and logistics are key in this renovation project.

 

Royal River Casino Phase 2 - Flandreau, SD

$19.15 Million (All four phases) | October 2018

Phase two of the renovation of the casino. Work included renovation to the guest services area and an expanded gaming floor and entry while the casino remains open to guests. Site safety and logistics were key. 

Royal River Casino Phase 1 - Flandreau, SD

$19.15 Million (All four phases) | October 2017

Construction of a new administration building and renovation of the VIP and gaming areas for the Royal River Casino while the casino remains open to guests. Site safety and logistics were key.

 

Flandreau Santee Sioux Tribal Health Clinic - Flandreau, SD

$10.4 Million | August 2017

The construction of a new 38,000 SF one-story clinic that provides a much needed expansion of basic health care services and space for the FSST health department. The expansion allows for additional services including imaging, physical therapy, mobile imaging services and the integration of the diabetes and behavioral health clinics.

 

Minnehaha Country Club Addition and Renovation - Sioux Falls, SD

$7.4 Million | August 2018

A two-story addition to the existing club that included a banquet space, pre-function space, restrooms and a coat room on the upper level and a fitness center with locker rooms and storage on the lower level. The first floor was remodeled. A new bar serves the larger area. The facility remained opened to members during construction. The project was a design-build project with Co-Op Architecture.

 

Nash Auburn Building Renovation - Sioux Falls, SD

$604,000 | June 2017

Renovation of a roughly 6,500 SF historic building. Scope included structural masonry and wood truss roof repairs along with window replacement, new roofing and exterior stucco. 